European Growth Leaders 2026

Annual ranking data providerLSEG WorkspaceUsed with permission · acknowledgements

An independent research observatory tracking Europe’s listed growth companies.

Francesco Castellaneta, Full Professor of Strategy and Entrepreneurship, SKEMA Business School – Université Côte d’Azur (GREDEG) · Scientific Committee Diego Zunino and Jackie Krafft

← All companies

Annual rank64

Sweden · Industrials

Alimak Group

Develops, manufactures and services vertical-access and working-at-height equipment for construction, industry, wind power and building maintenance.

+57%revenue growth
FY2022–FY2025
+66%net-income growth
FY2022–FY2025
+180%stock return
FY2022–FY2025
−9%2026 stock return
current context only

Company profile

Engineered access from construction hoists to wind towers and facades

Alimak Group is the listed parent behind five decentralised vertical-access divisions and the Alimak, Scanclimber, Tractel, CoxGomyl, Manntech and Avanti brands. In July 2026 it added Pro-Bel, a North American operating business consolidated into Facade Access, with its own suspended-access and fall-protection products and service organisation. Their systems move workers and materials on construction sites, provide permanent access inside industrial plants and wind towers, reach complex facades, and arrest falls or lift loads. Equipment sales feed a long installed-base relationship spanning inspections, parts, digital monitoring, refurbishment and replacement across more than 120 markets.

Products and brands

Different brands own different routes to height

Alimak's Scando 650a is a temporary construction hoist; its SE is a permanent industrial passenger-and-freight elevator. CoxGomyl and Manntech engineer building-maintenance units for facade access. Avanti's Shark, Dolphin, Barracuda, Pegasus and Octopus service lifts work inside wind towers. Tractel's Blocfor arrests falls, while Tirak hoists move people or materials. Scanclimber adds mast-climbing platforms within the issuer's brand portfolio. Pro-Bel adds roof anchors, davit arms, horizontal lifelines, monorails and BMU solutions for customers across Canada and the United States, extending Facade Access into more low- and mid-rise buildings.

Applications in the field

Installed references sit beside clearly labelled demonstrations

At Karlatornet, Alimak installed five hoists to separate passenger and material flows over 246 metres; at Brazil's Balsa Nova cement plant, a 119-metre SL-H 2000 remained for maintenance after construction. Manntech delivered three BMUs for Seoul's Parc1 towers, while CoxGomyl's film shows its facade system at 20 Fenchurch Street. In late 2025, Avanti commissioned a Pegasus L inside a 160-metre Shandong wind tower. Tractel's Tracrod film is a confined-space anchor demonstration, not a customer delivery.

Footprint and lifecycle

A global factory network serves equipment for decades

Alimak reports 26 production and assembly facilities in 15 countries, operations in 28 and sales across more than 120 markets. More than 26,000 installed units use proprietary controls; service spans inspections, repairs, digital monitoring, upgrades, refurbishment and replacement. At Borg Havn, technicians renewed a port-crane elevator after 25 years. Avanti separately refurbishes wind-tower lifts from initial assessment through final installation and recertification.

History and positioning

Product invention became a five-division growth platform

Founded in Skelleftea in 1948, Alimak introduced a steel construction passenger hoist in 1953, a rack-and-pinion mast-climbing platform in 1956 and a rack-and-pinion construction hoist in 1962. Acquisitions added Avanti and Facade Access Group in 2017 and Tractel in 2022. In 2026, Alimak added Pro-Bel, a North American suspended-access and fall-protection business, to Facade Access. Today the issuer delegates market strategy to five divisions; New Heights 2.0 targets current offers, key segments, lifecycle services, geographic expansion, technology partnerships and selective M&A for 2026-2030.

Current 2026 update

What is changing at Alimak Group in 2026?

Alimak is changing at three operating layers: Pro-Bel extends Facade Access into lower buildings, Avanti is reshaping its aluminium supply chain, and Construction has put its regional operating model under review.

Latest official evidence SBTi target approval Published 26 August 2026

The change in one sentence

A new business, a new material roadmap and a division under review.

The changes affect what Facade Access sells, how Wind sources aluminium, the input behind roughly 75% of the division's Scope 3 emissions and how Construction assigns regional responsibility.

Four lenses on 2026

The same four-quadrant format used in the Company profile.

01 · Facade Access

Pro-Bel adds anchors, davits and low-rise access in North America

Alimak completed the Pro-Bel transaction on 17 July; the Toronto-area business is consolidated into Facade Access effective 16 July. Founded in 1976, Pro-Bel serves Canada and the United States with more than 140 employees. Its products include roof anchors, davit arms, horizontal lifelines, monorails and building-maintenance-unit solutions. The portfolio extends the division into more low- and mid-rise buildings alongside its high-rise position and adds an established North American service organisation. Founder and CEO Marc Lebel remains for a transition period. Alimak presents extension into new geographies, shared practices and operating efficiencies as opportunities from integration, not results already delivered; Pro-Bel's CAD69 million LTM revenue and 34.6% adjusted EBITA margin, both for the period ended April 2026, predate consolidation.

02 · Wind / Avanti

Avanti changes the aluminium behind wind-tower access

Alimak says aluminium accounts for roughly 75% of the Wind division's Scope 3 emissions. Avanti is shifting procurement toward lower-emission primary aluminium and recycled alloys under a 2025-2031 supplier roadmap. The issuer reports that 2026 aluminium-sourcing emissions were 36% below the 2024 baseline, ahead of its 30% target, and that four lower-emission extruder partnerships were secured across Asia and Europe. Remaining milestones include 2026 targets of 25% lower-emission and 20% recycled aluminium, removal by 2027 of suppliers at or above 15 tonnes CO2e per tonne of metal, and 40% recycled aluminium by 2031; attainment of the 2026 mix is not disclosed. The 36% result is issuer-reported, not product-wide or independently audited. SBTi separately approved Alimak Group's 2031 targets on 26 August; it did not validate this result or target attainment.

  • Current signal36% issuer-reported sourcing reduction · four extruder partnerships · group targets approved 26 August
  • Why it mattersA major input to wind-access equipment now has a measurable supplier roadmap, while product impact and later milestones remain unproved.
  • Wind aluminium sourcing roadmap Alimak Group · 20 August 2026
  • SBTi target approval Alimak Group · 26 August 2026

03 · Construction

Construction puts its regional operating model under review

Karin Bååthe became Construction EVP on 7 April. Q2 orders rose 19%, driven by mast-climbing work platforms in Australia. Rental performed strongly in Australia and Germany, while service grew especially in Australia and the Nordic region. New-equipment orders in Europe remained soft. Revenue fell 18% to SEK333 million because lower hoist and platform orders in earlier quarters, plus project delays in the United Kingdom, Norway and India, reduced delivery; the EBITA margin fell to 8.3% from 16.7%. Alimak says it is taking steps to simplify the operating model and strengthen regional ownership and accountability. It has not disclosed a restructuring plan, headcount change, completion date or outcome.

  • Current signalAustralia platform orders · rental in Australia/Germany · Nordic service · revenue -18%
  • Why it mattersDemand exists in specific markets and service lines, but the disclosed operating-model actions and conversion of earlier orders into delivery remain unfinished.
  • Q2 division and operating review Alimak Group · 17 July 2026

04 · What to watch

Three questions for the next disclosures

Next reports should separate acquired capability from integration results, material sourcing from product footprint and Construction actions from recovery.

  • Pro-Bel integrationDoes Alimak disclose named cross-sell, service or operating results beyond the acquired business's pre-consolidation figures?
  • Wind material mixWhat shares of Avanti's aluminium are lower-emission or recycled, and does supplier exclusion progress toward the 2027 milestone?
  • Construction modelWhich regional-accountability changes are implemented, and do Australian orders convert into deliveries?

Annual record

Ranking history

Future editions add rows; they do not rewrite the 2026 record.

EditionMeasurement periodRankRevenue growthNet-income growthStock return
2026FY2022–FY202564+57%+66%+180%