European Growth Leaders 2026

Annual ranking data providerLSEG WorkspaceUsed with permission · acknowledgements

An independent research observatory tracking Europe’s listed growth companies.

By Francesco Castellaneta

← All companies

Annual rank33

Belgium · Industrials

Cenergy Holdings

Cenergy Holdings' portfolio includes Hellenic Cables, which makes power, telecommunications and submarine cables, and Corinth Pipeworks, which manufactures steel pipes for energy infrastructure and hollow sections for construction.

+45%revenue growth
FY2022–FY2025
+220%net-income growth
FY2022–FY2025
+420%stock return
FY2022–FY2025
+40%2026 stock return
current context only

Company profile · 2026 edition

Two industrial businesses supporting energy infrastructure

Cenergy Holdings SA is the listed Belgian parent of two industrial platforms: Hellenic Cables and Corinth Pipeworks. The first combines power- and telecom-cable factories with installation partnerships; the second combines welded-pipe mills, coating and logistics. This profile attributes plants and projects to the operating company, and keeps completed references separate from contract awards, conditional frameworks and capacity still being built.

2026 edition record. This historical profile was prepared for the 2026 edition and can include developments after FY2025. Dated plans retain their stated status. Later editions may add analysis; factual corrections and link maintenance remain possible.

Parent and operating boundary

The listed issuer owns the platforms; its companies run the plants

Cenergy is the issuer: CENER trades on Euronext Brussels, with a secondary Euronext Athens listing. Its 2025 report assigns Hellenic Cables S.A. and its direct and indirect subsidiaries to cables, and Corinth Pipeworks S.A. plus its subsidiaries to steel pipes. The subsidiary accounts make ownership explicit: Cenergy owns 100% of Hellenic Cables and wholly owns Corinth Pipeworks. Hellenic consolidates Fulgor and Lesco plus project joint operations. Corinth's 2025 accounts provide a dated map: CPW Solar entered dissolution and liquidation on 14 October 2025, and CPW Wind did so on 13 January 2026. They also record CPW America, Warsaw Tubular Trading and wholly owned Corinth Pipeworks UK Limited, established in Q1 2026 for the Hartlepool transaction. The cables segment also includes Icme Ecab, whose Bucharest plant makes land power and telecom cables. Viohalco remains Cenergy's parent.

Hellenic Cables

Corinth makes the subsea lengths; Thiva closes the land route

Hellenic's range runs from array cables to 72.5 kV through HVAC export systems to 400 kV and HVDC export systems to 525 kV. In July 2026, its submarine and underground 525 kV HVDC XLPE systems successfully completed qualification for continuous operation at 80°C under CIGRE Technical Brochure 852 and, for the underground system, IEC 62895. Fulgor's Soussaki, Corinth plant makes submarine, fibre-optic, composite and special-purpose cables beside a cable-loading port; Thiva makes land power and telecom cables. Delivery runs from route survey and design through transport, laying, burial, protection, jointing and final tests. A completed reference is Hellenic Cables' Crete-Peloponnese circuit 1 interconnection: 135 km of submarine cable and 43 km of land cable, completed in 2022 as a turnkey 150 kV system, with water depths reaching 1,000 m.

Corinth Pipeworks

Four pipe mills feed coating, testing and project logistics

At Thisvi, four welded-pipe mills - 7-inch and 26-inch HFI, 100-inch SAWH and 56-inch LSAW - sit with external and internal coating lines. Output covers onshore and offshore line pipe plus hollow structural sections; up-to-24.4-m HFI lengths are designed to reduce onsite welding and field-joint coating. The concrete-weight-coating line was commissioned and operating in 2025, adding 12-40-inch offshore-pipe coating. CPW completed its TAP pipe-production scope: 28,600 pipes covering 495 km were manufactured and coated at Thisvi on schedule. The English corporate film shows testing, coating, storage, port handling and project logistics.

Strategy, geography and status

Global expansion is visible, but awards are not deliveries

The declared growth lanes are electricity networks and offshore wind for cables, and gas-transition, hydrogen and CCS pipelines for steel pipes. At 30 June 2026, the group reported about EUR 3.9 billion of backlog; its definition includes signed contracts plus work not yet enforced where a letter of award or preferred-bidder status exists, so backlog is not delivery. H1 reporting says expanded Corinth subsea capacity was fully available, additional Thiva land-cable capacity was ramping up, completing Maryland construction works by year-end remained a core priority, and Hartlepool integration and customer qualification were progressing, with further investment phased with demand. The June IPTO Lot A framework was expected to enter production in late 2027. The group reports large projects in more than 70 countries.

Annual record

Ranking history

Future editions add rows; they do not rewrite the 2026 record.

EditionMeasurement periodRankRevenue growthNet-income growthStock return
2026FY2022–FY202533+45%+220%+420%