European Growth Leaders 2026

Annual ranking data providerLSEG WorkspaceUsed with permission · acknowledgements

An independent research observatory tracking Europe’s listed growth companies.

Francesco Castellaneta, Full Professor of Strategy and Entrepreneurship, SKEMA Business School – Université Côte d’Azur (GREDEG) · Scientific Committee Diego Zunino and Jackie Krafft

← All companies

Annual rank96

Italy · Industrials

Prysmian

Manufactures cables and connectivity systems for power transmission, distribution, construction, infrastructure, voice, video and data.

+22%revenue growth
FY2022–FY2025
+152%net-income growth
FY2022–FY2025
+162%stock return
FY2022–FY2025
+43%2026 stock return
current context only

Company profile

Connect power and data from the seabed to the data centre

Prysmian makes the physical links behind electrification and digital networks. Its systems range from submarine and underground high-voltage cables to building wire, optical fibre and data-centre connectivity. The group also engineers entire links, installs them with purpose-built vessels and monitors assets after commissioning, joining materials science, factories, marine operations and network analytics in one delivery chain.

Power grids and monitoring

Build the cable, protect it and read its condition

Transmission and distribution systems include P-Laser thermoplastic cables, E-PATH-labelled products and accessories for high-, medium- and low-voltage networks. PRY-CAM adds continuous or temporary monitoring from 3 kV to 600 kV, turning electrical and environmental measurements into evidence for maintenance teams.

Digital infrastructure

Fit 864 optical fibres inside a cable less than one centimetre wide

Digital Solutions spans fibre, copper, connectivity, telecom access and data-centre infrastructure. Sirocco Extreme uses 180-micrometre BendBrightXS fibre and PicoTube technology: its 864-fibre version measures 9.8 millimetres across, helping operators add capacity inside congested ducts rather than excavating new routes.

Vessels and production

Lay deep-sea cables from a floating factory supplied by a vertical one

Prysmian Monna Lisa is 171 metres long, carries 17,000 tonnes of cable in two carousels and is designed for depths beyond 3,000 metres. At Pikkala in Finland, a 185-metre vertical production tower can make about one kilometre of 525 kV submarine cable per day.

Landmark links

Join islands and national grids across extreme routes

The Tyrrhenian Link uses lightweight synthetic armour for a record 2,150-metre installation trial. Viking Link combines roughly 1,400 kilometres of land and submarine cable between Britain and Denmark. NeuConnect adds a 725-kilometre, 1,400 MW UK-Germany route, while SuedOstLink takes 525 kV underground technology across Germany.

Current 2026 update

What is changing at Prysmian in 2026?

Prysmian is moving from connecting data-centre campuses to wiring their interiors, from selling cable to adding the hardware around it, and from solid-glass fibre toward air-core experiments.

Latest official evidence Conditional Atkore agreement Published 3 August 2026

The change in one sentence

Three moves target different physical layers of AI infrastructure: dense fibre inside buildings, cable-adjacent hardware on the job site and lower-latency links between clusters.

Their evidence stages differ: Molex is a long-term supply agreement with ceilings, Atkore is signed but not closed, and hollow-core has passed a deployment test without a reported customer network.

Four lenses on 2026

The same four-quadrant format used in the Company profile.

01 · Inside the data centre

Molex takes Prysmian from the cable route into the crowded space inside the building

On 20 July Prysmian signed a Molex agreement for up to EUR5.5 billion of optical cable over up to ten years, supported by a EUR550 million upfront payment. The broader plan describes EUR10 billion of cumulative hyperscaler/data-centre revenues, up to EUR1.1 billion annually from 2031 and EUR1.25 billion of capacity investment through 2031, including more than doubling US fibre capacity. The EUR550 million upfront payment is a distinct contract term, but the release does not state when or how it is recognised as revenue. The up-to totals and future annual/cumulative figures remain ceilings or forward plans, not guaranteed realised sales. H1 Digital Solutions revenue of EUR991 million and 13.8% organic growth describes the existing business and should not be attributed wholly to this newly signed programme. Separately, Sirocco Extreme shows the density problem: 864 fibres inside a 9.8mm cable. No source says Molex buys that exact product.

  • Current signalMolex: up to EUR5.5bn · up to 10 years · EUR550m upfront · capacity plan to 2031
  • Why it mattersPrysmian is targeting the high-density cabling inside data centres, where physical space and fibre count matter differently from long-haul links between sites.
  • Molex fibre agreement Prysmian · 20 July 2026
  • H1 Digital Solutions update Prysmian · 30 July 2026
  • 864-fibre density reference Prysmian · Current official product release

02 · Hardware around the cable

Atkore would add conduits, trays and framing — if the signed transaction closes

Prysmian entered a definitive merger agreement on 3 August to buy Atkore for $95 per share in cash, an implied enterprise value of about $3.8 billion or EUR3.3 billion. Atkore makes the steel, PVC and aluminium conduit that protects cable, plus trays, ladders, baskets, armouring, framing, pipes and fittings across about 30 major manufacturing/distribution centres with roughly 5,400 employees. The parties target a calendar-year-end close, subject to Atkore shareholder, regulatory and customary conditions. Prysmian's FY2026 guidance excludes the transaction. Approximately $150 million of annual run-rate EBITDA synergies within three years of closing is a management target, not a contribution already achieved.

  • Current signalSigned 3 August · about $3.8bn EV · conditional year-end close · ~$150m future synergy target
  • Why it mattersIf completed, the offer would extend from the cable itself to the job-site systems that route, protect and support it.
  • Conditional Atkore agreement Prysmian · 3 August 2026

03 · Hollow-core test

Hollow core moves from a 10mm Prysmian test cable toward a partner-reported hyperscaler order

Prysmian, Relativity Networks and Dura-Line completed a deployment test of a 10mm cable containing 24 hollow-core fibres. It was installed in microduct at up to 350 feet per minute and met customer attenuation requirements. The cable is based on Prysmian's Sirocco cable architecture, but it is a distinct hollow-core product from the separately reported 864-fibre solid-glass Sirocco Extreme cable. The parties claim nearly 50% faster transmission and potential synchronised-cluster distance from about 60km to 90km. On 19 August, Relativity then announced a $40 million follow-on order from an unnamed hyperscaler after that customer tested ChronoCore linking two data centres. Relativity says ChronoCore is produced at Prysmian's Eindhoven site and cabled in Claremont. The order is Relativity's; neither fibre volume, delivery schedule nor Prysmian revenue allocation is disclosed. This is commercial order evidence beyond mere potential, but not a named live operating network or recognised Prysmian revenue.

  • Current signal24 HCF fibres · 10mm Prysmian cable · partner-reported $40m unnamed-hyperscaler follow-on order
  • Why it mattersHollow core has moved beyond one manufacturing test toward a commercial order, while the customer, operating deployment and economics attributable to Prysmian remain undisclosed.
  • Hollow-core deployment test Prysmian · 22 July 2026
  • H1 Digital Solutions update Prysmian · 30 July 2026
  • Hollow-core commercial order Relativity Networks via PR Newswire · 19 August 2026

04 · What to watch

Three questions for the next disclosures

The next evidence should convert ceilings, conditional agreements and technology tests into shipped volumes, completed transactions and named deployments.

  • Molex rampDoes Prysmian disclose actual capacity added, shipped volumes or recognised revenue under the Molex programme?
  • Atkore closingDo shareholder and regulatory approvals support a year-end close, and does FY2026 guidance remain scope-exclusive until consolidation?
  • Hollow-core adoptionDoes Relativity's $40m order lead to a named operating deployment or disclosed cable volumes and revenue attributable to Prysmian?

Annual record

Ranking history

Future editions add rows; they do not rewrite the 2026 record.

EditionMeasurement periodRankRevenue growthNet-income growthStock return
2026FY2022–FY202596+22%+152%+162%